The Student Housing Phase 3 is composed of approximately 57,940 assignable square feet/84,130 gross square feet in two four-story buildings on the campus at Scholars Lane between Emigrant Pass and Mammoth Lakes Road, just to the west of the Valley Terraces student housing complex. The Student Housing Phase 3 project accommodates primarily freshmen in its residence halls. The project site comprises approximately one acre of a two-acre site that was an interim student resident parking lot. After construction is complete, a portion of the parking lot is expected to be retained until a future student housing project begins construction (currently anticipated to start in 2012). Building A contains a combination of residential space and study/program space. The programming space on the ground floor is planned to accommodate multi-purpose meeting rooms, office, and support space. The three floors above are residential floors. Building B is primarily residential on four floors with a small amount of administrative space on the ground floor. The two buildings combined house 306 - 320 dormitory beds, including a minimum of 290 double-occupancy and 16 single occupancy bedrooms. This includes 300 revenue beds (290 double occupancy and 10 single occupancy bedrooms). There are six non-revenue beds for Resident Assistants. Most or all of the revenue double bedrooms can accommodate triple occupancy when necessary. The project includes site development and infrastructure, as well as landscape and hardscape space to the north of the buildings for casual and programmatic uses by the student residents. The Student Housing Phase 3 project is built on a portion of the 307-space resident parking lot. During construction, none of the original 307 spaces were available for parking; 209 spaces were provided elsewhere, leaving a temporary shortfall of 98 spaces. Approximately 71 spaces in the northerly portion of the resident lot will be returned to service at completion of the project, and until the Student Housing Phase 4 project is constructed.

Dates

  • Creation: Between 2008 and 2011

Extent

1 box (27 0526 Communication Bonding 27 0533 Communications Cable Tray 27 0811 Communications Twisted Pair Testing 27 1100 Communications Rooms 27 1232 Communications Backbone ISP Fiber Optic Cabling 27 1313 Communications Backbone ISP Twisted Pair Cabling 27 1314 Communications Backbone OSP Twisted Pair Cabling 27 1324 Communication Backbone OSP Fiber Optics 27 1333 Communication Backbone Coaxial Cabling 27 1553 Communications Horizontal Coaxial Cable 27 4116 Integrated Audio Video Systems 32 0540 Joing Sealants for Civil Work 32 1200 Flexible Pavement 32 1123 Aggregate Base Course 32 1314 Landscape Concrete 32 3010 Landscape Structure 32 8400 Irrigation 33 1000 Potable Water, Reduced Pressure Backflow Preventers 33 4000 Storm Drainage 33 5100 Natural Gas Systems Product Data 33 7119 Underground Electrical Work 33 7123 Medium Voltage Cable 33 7900 Electrical Grounding 95 5100 Acoustical Panel Ceilings)

Language of Materials

English

Location

Castle Warehouse, Large Shelf, B 10

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479