Submittals 26 0000 through 26 7000
Scope and Contents
The Student Housing Phase 3 is composed of approximately 57,940 assignable square feet/84,130 gross square feet in two four-story buildings on the campus at Scholars Lane between Emigrant Pass and Mammoth Lakes Road, just to the west of the Valley Terraces student housing complex. The Student Housing Phase 3 project accommodates primarily freshmen in its residence halls. The project site comprises approximately one acre of a two-acre site that was an interim student resident parking lot. After construction is complete, a portion of the parking lot is expected to be retained until a future student housing project begins construction (currently anticipated to start in 2012). Building A contains a combination of residential space and study/program space. The programming space on the ground floor is planned to accommodate multi-purpose meeting rooms, office, and support space. The three floors above are residential floors. Building B is primarily residential on four floors with a small amount of administrative space on the ground floor. The two buildings combined house 306 - 320 dormitory beds, including a minimum of 290 double-occupancy and 16 single occupancy bedrooms. This includes 300 revenue beds (290 double occupancy and 10 single occupancy bedrooms). There are six non-revenue beds for Resident Assistants. Most or all of the revenue double bedrooms can accommodate triple occupancy when necessary. The project includes site development and infrastructure, as well as landscape and hardscape space to the north of the buildings for casual and programmatic uses by the student residents. The Student Housing Phase 3 project is built on a portion of the 307-space resident parking lot. During construction, none of the original 307 spaces were available for parking; 209 spaces were provided elsewhere, leaving a temporary shortfall of 98 spaces. Approximately 71 spaces in the northerly portion of the resident lot will be returned to service at completion of the project, and until the Student Housing Phase 4 project is constructed.
Dates
- Creation: Between 2008 and 2011
Extent
1 box (26 0000 Basic Electrical Requirements 26 0519 Building Wire and Cable 26 0526 Grounding and Bonding 26 0529 Electric Hangars and Supports 26 0533 Conduit 26 0933 Central Dimming Controls 26 0534 Cable Management Boxes 26 0553 Electrical Identification 26 0913 Power Monitoring and Control Systems 26 2200 Dry Type Transformers 26 2413 Electrical Distribution System 26 2419 Motor Controls 26 2716 Cabinets and Enclosures 26 2719 Surface Raceways 26 2726 Wiring Devices 26 2816 Disconnect Switches 26 3554 Central Battery Inverter System 26 5000 Lighting Fixtures 26 5020 Automaic Lighting Cover Equipment 26 7000 Fire Alarm Systems )
Language of Materials
English
Location
Castle Warehouse, Large Shelf, B 11
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository