Memos and Reports, 2001 through 2004
Dates
- Modified: 2001 through 2004
Extent
1 folder (LRDP Draft EIR Volume 1 (Aug. 2001) LRDP Final EIR Volume 1 (Jan. 2002) Administrative Report (Jan. 2003) Draft Wastewater Treatment and Disposal - Focused Analysis (April 1999) Notice of Violation Ground Water Pollution (April 2002) UC Merced Sewer and Water Service Extension Project (June 2003) Morrison & Foerester LLP (Jan. 2003) Proposal for Engineering Studies, Design and Construction Management: Sewer and Water Service to UCM (Dec. 2002) North Merced Sewer Master Plan Summary Report - Preliminary Findings (Nov. 2002) Evaluation of Impacts of Future Groundwater Pumping and Preliminary Well Design for UCM (June 2003) Preliminary Water Delivery Alternatives for UCM (March 2003) County Encroachment Permit for Extension of Water and Sewer Connections to the UCM Campus (March 2003) Wastewater Discharge Requirements (Jan. 2004))
Language of Materials
English
Physical Location
Castle Warehouse, Chancellor's Archive Room, Physical & Environmental Planning Files, Box 29
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository