EHDD
Found in 14 Collections and/or Records:
50% Construction Documents, EHDD, 2007-02-23
Project contains 10,847 gross square feet (gsf) and 8,224 assignable square feet (asf). Project is adjacent to existing campus dining facility and proximate to two campus housing projects. The combined dining facility will serve about 1,000 resident students in addition to staff, faculty and visitors. Project increases campus dining capacity from 345 to 668 seats (504 indoor and 164 outdoor seats)
100% Construction Documents and Specifications, Volumes 1-3, 2007
Collection is contained in separate brown bags for each plan set. Title is written in black marker on each bag, including Project, document phase, and date.
100% Construction Documents Supplemental Materials; Lighting Fixture Schedule and Cut Sheets, 20030331
Collection is contained in separate brown bags for each plan set. Title is written in black marker on each bag, including Project, document phase, and date.
100% Construction Drawings, 2007-04-16
Project contains 10,847 gross square feet (gsf) and 8,224 assignable square feet (asf). Project is adjacent to existing campus dining facility and proximate to two campus housing projects. The combined dining facility will serve about 1,000 resident students in addition to staff, faculty and visitors. Project increases campus dining capacity from 345 to 668 seats (504 indoor and 164 outdoor seats)
Bid Release 1 Drawings, EHDD, 2011-08-16
Dormitory for lower division students. This project provides approximately 350 student beds and one live-in staff apartment adjacent to Student Housing Phase 3 in the Campus West Neighborhood. LAKE VIEW CAAN: 0253
DE 100% CDs, Fire Alarm System Submittal Drawing, 2008-01-22
Collection is contained in separate brown bags for each plan set. Title is written in black marker on each bag, including Project, document phase, and date.
H4, BR2 Drawings and Addendum 4 to Contract Docs, 2011-10-14
Collection is contained in separate brown bags for each plan set. Title is written in black marker on each bag, including Project, document phase, and date.
H4, BR3, DSA Approval Record Set, Vol 2, 2011-12-07
Collection is contained in separate brown bags for each plan set. Title is written in black marker on each bag, including Project, document phase, and date.
Project Manual and Specifications, 100% Construction Document, 20070426
Collection is contained in separate brown bags for each plan set. Title is written in black marker on each bag, including Project, document phase, and date.
Specifications, 100% Construction Documents, Electrical Panel Schedules
Collection is contained in separate brown bags for each plan set. Title is written in black marker on each bag, including Project, document phase, and date.